Licensed · Bonded · Insured — Serving Northern Virginia & Washington DC 24-hour emergency service · (703) 256-8080
Call (703) 256-8080
Virginia licensed · Bonded · Insured · Since 1999

Door Installation and Fitting in Northern Virginia

A new door only hangs true if the opening behind it is sound — which is why we open the frame up and look before anything new goes in.

Written price before any work starts · Permits pulled where required · Phones answered 24 hours a day

White French doors set in a rough opening with flashing tape and factory stickers on the glass, exterior view
Exterior view of a French door installation mid-job: the white double door unit is set and flashed with the manufacturer stickers still on the glass, with the exterior trim yet to go on.

Last updated: Service area: Northern Virginia

Door installation is mostly about the opening, not the door. A new unit only hangs square if the rough opening is square, the sill plate under it is sound and the floor below is level. So the old unit, its interior casing and its exterior brick molding come out first, and the wall frame and sill plate are inspected for water, insect and other damage before anything new goes in. Threshold flashing is set and sealed, framing gaps are insulated, and casing, brick molding, lockset and paint finish the job.

What door installation involves, from removal to final paint

The sequence below is what our contracts actually say, in the order the work happens. It is the same shape whether the unit is an interior passage door or a double patio door.

  1. Protect the house. Floor and furniture protection goes down, with drop cloths over flooring, furniture and electronics, and plastic tenting where the work will raise dust.
  2. Remove the old unit. The door unit, interior casing and exterior brick molding come out, and on a full replacement the frame and sill come with them. The old door is hauled away and disposed of.
  3. Inspect the wall frame and sill plate. Every opening we open gets checked for water, insect and other damage, and you are told what is found before the new unit goes in.
  4. Install threshold flashing. On exterior openings, new metal threshold flashing goes in before the unit and is sealed with polyurethane caulk to stop future decay of the jamb and house framing. Where the head is exposed, top-rail flashing goes on too.
  5. Set and fasten the new unit. The door is shimmed, leveled and secured so the reveal is even and the slab closes against the stop along its whole height.
  6. Insulate and seal the gaps. The gap between the jamb and the rough framing is filled with fiberglass insulation or expanding foam, never left open.
  7. Trim it out. New interior casing to match the existing, rot-resistant composite brick molding outside, and the end grain of the new jamb sealed against decay.
  8. Hardware and finish. Lockset and deadbolt fitted, everything caulked and sealed inside and out, nail holes filled, then primed and painted to match.

Prehung door units vs. door slabs: which one your opening needs

The single biggest decision on a door installation is whether you are buying a door or a door and a frame.

A prehung unit
The slab arrives already hung in its own jamb with the hinges mortised and the strike bored. This is what we fit on almost all exterior work — primed white prehung inswing units, six-panel steel doors, full-lite glass patio doors — because the new jamb is square even when the old one was not.
A slab into an existing frame
Cheaper and faster, and reasonable when the existing frame is genuinely sound and square. We do this on interior doors regularly: individual passage door slabs replaced, with the casing, baseboard and corner molding made good around them.
A new frame taking an existing slab
Less common but real. On a commercial entry where the lower two to four feet of the frame was damaged, we installed a new 36 by 84 inch solid 20-minute fire-rated frame and reinstalled the existing exterior slab into it, with double-key deadbolts fitted.
An owner-supplied door
We install doors homeowners have already bought, including special orders picked out at a big-box store and owner-provided sliding closet doors. The only thing we ask is that the size and swing are confirmed before it is ordered.

Installing a door in an out-of-square or settled opening

Older houses move. The opening that took a door in 1978 is rarely still square, and a prehung unit forced into a racked opening will bind within the year. What we do about it:

  • Level the floor below the door. On entry doors where the floor under the opening was out of level, leveling that floor was written into the scope before the new unit was set. This is the step most often skipped elsewhere and the reason a new door starts dragging.
  • Resize the opening to the unit. Where a replacement would not fit as-is, we have resized openings with 2x4 framing, then made good the exterior trim and the drywall inside.
  • Reframe to a standard size. On a living room opening that had been cut oversized and was failing, the outside of the opening was framed back with 2x4s to a 6 ft wide opening at the existing height, with pressure-treated sill pieces, and the new wall was clad in matching HardiePlank siding and trim.
  • Shim, don't force. The unit is set plumb and level to itself, and the difference between the unit and the opening is taken up in shims and insulation rather than in the door.
  • Deal with the rot first. Where the sill plate or jamb stock is soft, that gets cut out and replaced before the new unit lands on it — see rotted wood and trim repair.

Cutting a new door opening: framing, headers and rough openings

Putting a door where there was never a door is a framing job with a door at the end of it. We do this work regularly as part of remodels and conversions.

  • Interior openings. We have extended framing to create a new 36 inch door opening in a lower-level entryway, and cut a new door through from a bathroom into a master bedroom during a remodel. Existing entry doors have been resized and relocated where a layout changed.
  • Structural openings. Where a load-bearing wall is involved, temporary shoring walls go up before anything is removed, and the opening is framed with posts and headers per engineering plans. That is not handyman work and we do not treat it as such.
  • Exterior openings. A crawl space with no direct exterior access had a new door opening cut and framed as part of an encapsulation job, with the surrounding grade corrected at the same time.
  • Openings in the ceiling. Pull-down attic stairs are the same problem turned upward: a 22 by 31 inch opening cut between the trusses, 2x6 pine framing installed and braced to the trusses, then the unit set and secured.
  • Making good afterwards. New drywall, casing, baseboard and paint are part of the scope, not a second visit — see interior and exterior painting.

Converting a window or a wall into a door opening

Window-to-door conversions are some of the most satisfying work we do, and they are unforgiving if the opening is not prepared properly.

On a kitchen remodel the homeowner wanted a window turned into a French patio door: the window opening was reframed down to the floor to accept a full-height door, and the siding was matched with HardiePlank around the new opening. On another house, a picture window became a patio door — the glass panel and frame came out, the ten-inch knee wall beneath it and the surrounding trim were removed, the opening was prepared and the framing secured, threshold flashing was installed and caulked with polyurethane against jamb and framing rot, and a 72 by 80 inch French patio door was set in.

Garage conversions run the same way. On an attached garage turned into a bedroom, the garage door opening was framed for a new six-foot double French door and the old side entry opening was framed down to a window opening. If you are weighing a window change against a door, window repair and replacement covers the other half of that decision.

Interior door installation: pocket, bifold and closet doors

Pocket doors
We install pocket doors in place of swing doors where space is tight — most often during kitchen and basement work, where a closet door was replaced with a pocket door as part of the wider scope. See pocket and barn door repair for servicing them afterwards.
Bifold doors
New bifolds are resized to fit the existing opening rather than the opening being rebuilt around a stock size, then the door, track and brackets are installed and the slab is prepared and painted to match. We have also converted bifold openings to a swing door where the bifold was never the right answer.
Sliding and louvered closet doors
Fitted into existing closet openings, including doors the homeowner supplied, and adjusted until they run and latch properly. We have widened closet openings as part of larger jobs where the existing opening was too narrow.
Passage and utility doors
Interior slabs, laundry and mechanical room doors, and basement doors go in with new casing to match the existing trim, then caulked, primed and painted.
Fire-rated assemblies
Where code calls for it — a commercial entry, a hallway opening off it — we install 20-minute fire-rated solid doors and frames, with swing direction confirmed against approval before ordering.

Exterior door installation: flashing, insulation and sealing

Everything that goes wrong with an exterior door five years after it was installed traces back to three details that cost almost nothing to get right on the day.

  • Threshold flashing, installed before the unit. New metal threshold flashing goes in first and is sealed with polyurethane caulk. Without it the sill plate and the jamb feet sit in whatever water gets past the threshold, and we have pulled doors where that had been happening for years.
  • Framing gaps filled, not left hollow. Fiberglass insulation or expanding foam fills the gap between jamb and framing. An uninsulated gap is a draft, a cold floor and a path for water.
  • Jamb end grain sealed. The cut ends of a new jamb wick water faster than any other part of it, so they are sealed before the trim goes on.
  • Composite brick molding instead of wood. We specify rot-resistant composite around exterior openings as standard, because wood brick molding in the same position is what we keep coming back to replace.
  • Top-rail flashing where the head is exposed. On more than one leak call the cause was flashing that had never been installed above the door head trim, so it goes on as part of the install rather than after the ceiling stains.

For entry doors specifically, front door repair and replacement goes into security, sidelights and threshold detail.

Do you need a permit for door installation in Virginia?

Swapping a door into an existing opening of the same size generally does not require a permit. Cutting a new opening, changing the size of an opening, or touching a load-bearing wall does, in every jurisdiction we work in.

Where a permit applies we pull and process it ourselves, and the permit and processing fees are written into the contract rather than turning up later. On projects built to approved plans, the plans, permits and inspections are carried in the contract price, work is staged against inspection milestones, and nothing is closed up before the inspector has seen it. All of it is performed according to the Virginia building code by a licensed contractor holding Virginia DPOR license #2705070610.

How door installation is scheduled and priced

Most door installations start when the door arrives, not when the contract is signed. Our scopes say so plainly — work begins upon door delivery — because a special-order unit sets the calendar and we would rather tell you that up front than open a wall and wait. Where an existing door has to keep working until the new one lands, we write that in too.

We do not quote door prices by phone and we do not publish them. The unit is only part of it: an opening that has to be reframed, a sill plate that has rotted, a floor that has to be leveled, siding that has to be matched, and interior finishing all change the job. An estimator comes to the property, measures the opening, and gives you a written price before any work begins. If what you have is a door that binds rather than a door that needs replacing, start at door repair. We cover Northern Virginia and Washington DC on (703) 256-8080.

Service details

Service areaNorthern Virginia
Phone(703) 256-8080
Emergency service24 hours a day, 7 days a week
Office hoursMonday–Friday 8:00am – 5:00pm
Saturday 9:00am – 12:00pm
Sunday closed
Response timeSame business day during business hours; next business day after hours
EstimatesIn person, at the property. Every job is priced only after a professional estimator has seen the work, we do not quote prices by phone or email, with some exceptions.
LicensingVirginia DPOR class A contractor license #2705070610
PermitsPulled and processed by us where the county requires them, with final inspection
Warranty1-year warranty on labor only

Frequently asked questions

How long does it take to install a door?

A straightforward swap into an existing opening is usually a single day on site once the door is in hand. The calendar is set by the unit, not the labor: special-order and custom-size doors are ordered first and our contracts state that work begins on door delivery. Jobs that involve reframing an opening, replacing a rotted sill plate, leveling the floor under the door or matching siding around a new opening run longer, and the estimator will tell you which of those apply before you sign anything.

Should I buy a prehung door or just a slab?

If the existing frame is square, sound and staying, a slab is the cheaper and quicker option and we fit them routinely on interior doors. For anything exterior, or where the old frame has moved, we fit a prehung unit so the door arrives already hung square in its own jamb. There is a third path we use on damaged frames: install a new frame and reinstall the existing slab into it, which we have done on a commercial entry where the lower part of the frame had failed.

Can you put a door where there isn't one now?

Yes. We have extended framing to create a new 36 inch opening in a lower-level entryway, cut a door through from a bathroom to a master bedroom during a remodel, and framed a new exterior access door into a crawl space. Where the wall is load-bearing, temporary shoring goes up first and the opening is framed with posts and headers per engineering plans, under permit. Drywall, casing, baseboard and paint around the new opening are part of the same scope.

Can a window be turned into a patio door?

Yes, and we do it often. On one kitchen the window opening was reframed down to the floor to take a full-height French patio door and the siding was matched with HardiePlank around it. On another, a picture window and the ten-inch knee wall beneath it came out, the opening was prepared and the framing secured, threshold flashing was installed and sealed with polyurethane caulk, and a 72 by 80 inch French patio door was set in. The exterior has to be made weathertight and matched, which is most of the work.

Do you install doors that I buy myself?

Yes. We install owner-supplied and owner-selected units regularly, including special orders picked out at a big-box store and homeowner-provided sliding closet doors. The one thing worth doing before you order is having the opening measured and the swing direction confirmed, because a unit that is the wrong hand or the wrong size cannot be made right on site and the delivery clock starts again.

What goes wrong when a door is installed badly?

Three things, and we see all three when we pull old units. Threshold flashing was never installed, so the sill plate and jamb feet have been sitting in water. The gap between the jamb and the framing was left hollow instead of insulated, so the door drafts and the floor is cold. And the unit was forced into an out-of-square opening rather than the opening being corrected, so the door has been binding since the week it went in.

Do you need a permit to install a door in Virginia?

Replacing a door in an existing opening of the same size generally does not. Cutting a new opening, enlarging an existing one, or working on a load-bearing wall does. Where a permit applies we pull and process it ourselves, permit and processing fees are written into the contract, and on plan-built work the plans and inspections are carried in the price with the job staged against inspection milestones.

What does door installation cost?

We do not price doors by phone or publish figures, because the unit is rarely the variable. Reframing an opening, replacing a rotted sill plate, leveling the floor under the door, matching siding, new casing and brick molding, hardware and paint all move the number. An estimator visits, measures the opening, looks at what is around it, and gives you a written price before any work starts.

Do you install interior doors as well as exterior ones?

Yes. Interior door installation is a large part of our work: passage door slabs, pocket doors fitted where a swing door will not fit, bifolds resized to the existing opening, sliding and louvered closet doors, laundry and mechanical room doors, and pull-down attic stairs set into a framed opening between the trusses. Casing, baseboard and paint around each one are included rather than left for someone else.

Our own work on this

Photographs from jobs this company has carried out. No stock photography, no other contractor’s work.

BeforeNew patio door unit set in the opening with flashing membrane taped around the head and jambs
AfterThe same patio doorway finished, with exterior trim and siding closed in around the new French doors
A failing patio door unit was taken out and replaced. The new French door and sidelights are set into the rough opening and the head and jambs are sealed with flashing membrane before the exterior trim goes back on.
BeforeRough door opening cut through a wall to a snow-covered roof deck with exposed framing and blue sky
AfterNew white French doors installed in an attic room with a sloped ceiling, drop cloths and tools on the floor
French door installation on an upper-floor roof deck. Before, the rough opening was cut open to the snow-covered deck with the framing exposed. After, the new white French doors are hung and trimmed with the drop cloths still down.
New white full-lite exterior door hung and trimmed in its opening, standing open
A new full-lite exterior door hung in a re-framed opening, shimmed plumb and trimmed, with the interior protected by drop sheets during the swap.
Dark wood bifold closet doors with frosted glass panels installed in a white-trimmed opening
Bifold door installation finished in a closet opening: dark wood-framed bifold doors with frosted glass panels hung in a white-trimmed jamb with new hardware.

Licensing, insurance and guarantee

Virginia licensed contractorDPOR license #2705070610
Licensed · Bonded · InsuredFor residential and light commercial work
Serving since 199927 years in Northern Virginia

Related services

Areas we serve

Talk to us about a new door

Call and speak to a licensed Northern Virginia contractor. Every call is scheduled as soon as the calendar allows, and genuine emergencies are dispatched around the clock.

(703) 256-8080 Estimate