Licensed · Bonded · Insured — Serving Northern Virginia & Washington DC 24-hour emergency service · (703) 256-8080
Call (703) 256-8080
Virginia licensed · Bonded · Insured · Since 1999

Kitchen Remodeling in Northern Virginia and Washington DC

Cabinets and countertops are the part you see; the floor build-up, the circuits and the relocated gas and water lines are the part that decides whether the kitchen lasts.

Written price before any work starts · Permits pulled where required · Phones answered 24 hours a day

White kitchen with a long marble-look island, two globe chandeliers and light wood floors
Completed kitchen remodeling: a long marble-look quartz island with white shaker cabinets on both sides, two globe chandeliers overhead, light oak flooring, and a black-framed window over the sink.

Last updated: Service area: Northern Virginia

A full kitchen remodel takes out the appliances, sink, cabinets and countertops, strips the floor to the subfloor, and rebuilds from the structure up: subfloor secured, cement board, tile, then cabinets, countertops, backsplash, appliances and lighting. Plumbing and gas lines are relocated to the new layout and the electrical rough-in is brought up to current Virginia code. The same licensed firm performs that plumbing, gas and electrical work, permits are pulled where walls or services change, and the price is written in person before demolition.

What is included in a full kitchen remodel?

A gut kitchen remodel is a structural and mechanical job wearing a decorative face. This is the order our contracts run in:

  1. Containment. Plastic dust tents go up and furniture, flooring and electronics are covered before demolition. A kitchen opens onto the rest of the house, so containment matters more here than anywhere else.
  2. Appliances out. Refrigerator, range or cooktop, wall oven, range hood and dishwasher are disconnected and removed. Anything being reused is set aside — we have kept a client’s dishwasher through a full remodel and moved an old sink faucet onto a new laundry room sink rather than throw it away.
  3. Sink, cabinets and counters out. The sink and faucet, every wall and base cabinet, all countertops and the baseboard and shoe molding come out.
  4. Floor down to the deck. Tile and grout are removed to the subfloor and the subfloor is inspected.
  5. Walls and openings. Any wall removals, enlarged openings or new door and window openings are framed at this stage.
  6. Rough-in. Plumbing, gas and electrical are relocated and rebuilt for the new layout, then inspected where a permit requires it.
  7. Close up and finish. Insulation and drywall, floor build-up and tile, cabinets, countertops, backsplash, appliances, lighting, trim and paint.

The work is performed to the Virginia building code. What separates one contractor from another on a kitchen is almost never the cabinet doors — it is whether steps four, five and six were done properly underneath them.

Can a wall between the kitchen and dining room be removed?

Often, and it is the single change that transforms a dated kitchen most. We have taken out two walls between a dining room and a kitchen, enlarged the opening between a kitchen and a family room, removed pantry and laundry room walls to gain floor area, converted an island into a peninsula, and added a kitchenette and bar into an adjoining dining room.

The first question is always whether the wall carries load. On one project four posts between a kitchen and dining room were confirmed non-load-bearing before they were removed. On another, the wall between the kitchen and the dining room was load-bearing, so the opening was carried on approved plans with permits and inspections, with temporary shoring in place before anything was cut and the new framing built to the engineer’s details.

Openings in exterior walls are the same kind of work. We have converted a kitchen window into a French patio door, replaced a family room window with a smaller unit, and swapped a swing closet door for a pocket door as part of a kitchen reconfiguration.

How a kitchen floor is rebuilt before the tile goes down

Kitchen tile fails because of what is under it, not because of the tile. Our floor build-up is deliberate and it is the same every time:

  • Strip to the subfloor. Existing tile, grout and underlayment come off down to the deck, and the subfloor is inspected and reported.
  • Secure the deck. The existing subfloor is screwed down to the joists — on one kitchen, at six-inch intervals across the whole floor — and the joints are sanded flat.
  • Add plywood where the build-up calls for it. 5/8 inch plywood, glued and screwed.
  • Cement board over that. 1/2 inch cement board, again glued and screwed, rather than tile laid straight onto wood.
  • Slab floors get prepared, not ignored. On a kitchen over a concrete slab, the slab was ground and smoothed before any tile went down.
  • Grout chosen for the joint. Unsanded grout on tight-jointed porcelain, sanded grout where the joints are wider. The wrong one cracks or will not pack.

While the walls are open at floor level we also correct what is exposed: on one kitchen the exterior wall was re-insulated with R-15 fiberglass and a sleeve was fitted around the supply lines before new half-inch drywall went back, taped, blocked, skimmed and sanded.

Cabinets, countertops and backsplash in a kitchen remodel

Cabinets go in level and plumb to the rebuilt floor and the corrected walls, which is why the order above matters. Shaker-style cabinetry and quartz countertops are what most of our clients specify, and quartz is templated after the cabinets are set rather than before.

The backsplash is where shortcuts show. Where old mirrors or damaged wallboard come off the backsplash area, we board it in half-inch moisture-resistant Durock before tiling rather than tiling onto whatever was left behind. And the joint between the backsplash tile and the countertop is caulked with a mildew-resistant siliconized kitchen caulk, not grouted. That joint moves every time the counter is loaded; grout in it cracks and lets water behind the counter. Failed caulk at exactly that joint is one of the most common kitchen repairs we are called out for.

A backsplash can also be done on its own, without a remodel. We have installed one as a stand-alone job for a client who supplied the tile.

Does a kitchen remodel need new electrical circuits?

Almost always. A kitchen that was wired decades ago does not have the circuits a current kitchen needs, and moving the range, the refrigerator or the island changes where those circuits have to land. On our gut remodels the electrical rough-in is brought up to current Virginia code with added circuits — on one kitchen that included running a circuit for a future EV charger while the walls were already open, which is far cheaper than opening them again later.

Lighting is the other half of it. We have removed a single ceiling fixture and installed five recessed lights with new wiring and a dimmer switch in its place, and put a blank plate where an unwanted kitchen ceiling fan came down. See lighting installation for that work on its own, and electrical panel upgrades where the existing panel cannot take what the new kitchen needs.

Who does the plumbing, gas and electrical in a kitchen remodel?

We do. Sam & Sons Services is a licensed Virginia contractor — DPOR license 2705070610 — and the water, waste, gas and wiring inside a kitchen remodel are performed by the same firm that signed your contract. On a kitchen relocation we moved the gas and plumbing lines to the new layout ourselves; on others we ran a copper refrigerator supply and set a recessed supply box with a valve, replaced sink shut-offs, and secured hot water lines found running loose through a kitchen ceiling.

Details that get missed by trades working in isolation are the ones we look for: a kitchen sink with no vent, found as a code item on an inspection punch list and corrected; a dishwasher drain line with no high loop, looped and anchored so waste cannot siphon back; a garbage disposal at the end of its life replaced during the remodel rather than a month after it. Related repairs we handle separately include kitchen sink repair and installation.

Do you need a permit for a kitchen remodel in Virginia?

Swapping cabinets, a countertop or an appliance in place generally does not. Removing a wall, enlarging an opening, cutting a new exterior opening, relocating plumbing or gas, or adding circuits does — and a gut kitchen remodel usually does all of those at once.

Where a permit is required we pull it before the job starts, in the jurisdiction the house sits in, and we work to approved plans. Plans, permit, permit processing fees and inspections are written into the contract price rather than presented as extras. On a load-bearing opening the structural framing follows the engineer’s plans and is inspected before it is covered. Payment milestones are tied to the work passing inspection and to completing the drywall, so the inspector sees the rough-in first.

How long does a kitchen remodel take?

Longer than a bathroom, and the schedule is set by the sequence rather than by a promise made on the phone. Demolition and floor strip-out, framing of any wall changes, plumbing, gas and electrical rough-in, the rough-in inspection where one applies, insulation and drywall, floor build-up and tile, then cabinets, countertop template and fabrication, backsplash, appliances, lighting and trim.

Two items dominate the calendar. Countertops cannot be templated until the cabinets are set and fabrication takes its own time. And cabinetry has to be on site when the schedule calls for it. Plan for the kitchen to be out of use across the whole run and set up a temporary arrangement before demolition day.

What does a kitchen remodel cost in Northern Virginia and Washington DC?

We do not price kitchen remodeling over the phone and we do not publish figures or per-square-foot numbers. A kitchen estimate depends on whether a wall is load-bearing, what the subfloor looks like under the old tile, whether the panel can carry the new circuits, whether gas and water have to move, and what grade of cabinetry and countertop you choose. A number produced without seeing those things is a guess, and a guess is not what you want to sign.

An estimator comes to the house, works through the scope with you and puts the price in writing before demolition. Where selections are still open, the contract can carry a stated finish allowance for tile, fixtures and finishes so you can choose later without renegotiating the whole job. Permit and processing fees are in the contract. Anything uncovered during demolition is reported to you and agreed in writing before it is covered up — which is the only way a kitchen price stays a price.

Service details

Service areaNorthern Virginia
Phone(703) 256-8080
Emergency service24 hours a day, 7 days a week
Office hoursMonday–Friday 8:00am – 5:00pm
Saturday 9:00am – 12:00pm
Sunday closed
Response timeSame business day during business hours; next business day after hours
EstimatesIn person, at the property. Every job is priced only after a professional estimator has seen the work, we do not quote prices by phone or email, with some exceptions.
LicensingVirginia DPOR class A contractor license #2705070610
PermitsPulled and processed by us where the county requires them, with final inspection
Warranty1-year warranty on labor only

Frequently asked questions

Can you open up my kitchen by removing a wall?

Usually yes. We have removed two walls between a dining room and kitchen, enlarged a kitchen-to-family-room opening, and taken out pantry and laundry walls. If the wall is non-load-bearing it comes out once that is confirmed. If it carries load, the opening runs on approved plans with an engineered header, temporary shoring during the cut, a permit and an inspection.

What goes under kitchen tile so it does not crack?

The old tile and underlayment come up to the subfloor, the subfloor is screwed down tight to the joists and its joints sanded, then 5/8 inch plywood is glued and screwed down, then 1/2 inch cement board glued and screwed over that. Tile is set on the cement board. On slab floors the concrete is ground and smoothed first instead.

Should the joint between the countertop and the backsplash be grouted or caulked?

Caulked, with a mildew-resistant siliconized kitchen caulk. That joint moves whenever the countertop is loaded, and grout in a moving joint cracks and lets water behind the counter. Failed caulk at the counter-to-backsplash line and around the sink is one of the most frequent kitchen repairs we are called to, and it is avoidable at installation.

Do you install the cabinets and countertops, or does a cabinet company?

We install them as part of the contract, after the floor has been rebuilt and any wall changes are framed and closed. Quartz countertops are templated once the cabinets are set and level, never before, because a template taken off drawings rather than off installed cabinets is how gaps at the wall happen.

Does a kitchen remodel require an electrical permit and new circuits?

A kitchen gut nearly always needs added or relocated circuits, and that work is permitted. We bring the electrical rough-in up to current Virginia code as part of the remodel. On one kitchen we also ran a spare circuit for a future EV charger while the walls were open, because running it later means opening finished walls again.

Who handles the plumbing and gas work in a kitchen remodel?

It stays on your contract with Sam & Sons Services, which holds Virginia DPOR license 2705070610 and is responsible for the plumbing, gas, electrical and HVAC in the remodel. On a kitchen relocation we moved the gas and water lines to the new layout, ran a copper refrigerator supply with a recessed valve box, and corrected items such as a missing sink vent and an unanchored dishwasher drain line.

How long will I be without a kitchen?

Across the whole run, so plan a temporary kitchen before demolition. The sequence is demolition, framing, rough-in and inspection, drywall, floor build-up and tile, then cabinets, countertop template and fabrication, backsplash, appliances and trim. Countertop fabrication and cabinet delivery are the two items that most often set the calendar.

How much does a kitchen remodel cost per square foot?

We do not quote per square foot or by phone, because square footage does not tell anyone whether your wall is load-bearing, what the subfloor looks like, whether the panel can carry the new circuits or whether the gas line has to move. An estimator comes out, writes the scope and the price before demolition, and anything found later is agreed in writing.

Do you remodel kitchens in Washington DC?

Yes. Our remodeling work covers Northern Virginia and Washington DC, with the permit pulled in the jurisdiction the property sits in. The same licensed firm handles the carpentry, the plumbing, the gas and the electrical either side of the river, and the scope and price are written on site before any demolition begins.

Our own work on this

Photographs from jobs this company has carried out. No stock photography, no other contractor’s work.

Marble-look island top under a caged globe pendant with white cabinets and a stainless range behind
Kitchen remodeling detail at the island: the veined quartz countertop under a large caged globe pendant, with a wine fridge, tall pantry cabinets, and the stainless range on the back wall.
White kitchen with an island and stool, globe pendant, black-framed windows and light wood floor
Finished kitchen remodel looking toward the back windows: white shaker cabinets, quartz island with seating, globe pendant, and light oak floors running to the black-framed door.
White shaker cabinets with a stainless wall oven, microwave and marble-pattern backsplash
Kitchen remodeling finished on the appliance wall: white shaker cabinets, a stainless wall oven and microwave, paneled refrigerator, and a marble-pattern tile backsplash under the cabinets.
Kitchen wall with a paneled built-in refrigerator, wall oven, white cabinets and light wood floor
Refrigerator wall after kitchen remodeling: a paneled built-in fridge flanked by white cabinets, a wall oven and microwave tower, and under-cabinet lighting over the tile backsplash.
White bar cabinets with glass doors, a wine rack, small sink and wine fridge beside a staircase
Bar area from a kitchen remodeling project: white cabinets with glass doors and a wine rack above, a small sink in the quartz counter, and a built-in wine fridge next to the stairs.

Licensing, insurance and guarantee

Virginia licensed contractorDPOR license #2705070610
Licensed · Bonded · InsuredFor residential and light commercial work
Serving since 199927 years in Northern Virginia

Related services

Areas we serve

Book a written kitchen estimate

Call and speak to a licensed Northern Virginia contractor. Every call is scheduled as soon as the calendar allows, and genuine emergencies are dispatched around the clock.

(703) 256-8080 Estimate