Licensed · Bonded · Insured — Serving Northern Virginia & Washington DC 24-hour emergency service · (703) 256-8080
Call (703) 256-8080
Virginia licensed · Bonded · Insured · Since 1999

Bathroom Remodeling Contractors in Northern Virginia

The room comes apart to the framing, what is wrong behind the tile gets corrected while it is open, and one licensed firm does the plumbing and the electrical inside it.

Written price before any work starts · Permits pulled where required · Phones answered 24 hours a day

Walk-in glass shower with gold rain head and handheld sprayer, round mirror and vanity visible beyond
Finished bathroom remodel with a glass-enclosed walk-in shower, brushed gold rain head and handheld, and a round mirror over the new vanity beyond the glass.

Last updated: Service area: Northern Virginia

A full bathroom remodel strips the room to the framing: fixtures, floor tile, shower tile and the wallboard behind it all come out, the subfloor and wall framing are inspected and reported, then new shower valve piping, cement board, tile, vanity, toilet, lighting and ventilation go back in. The same licensed firm is responsible for the plumbing and the electrical work, permits are pulled where the scope requires them, and an estimator sets the price in writing, in person, before any demolition starts.

What does a full bathroom remodel include?

A full bathroom remodel is not a resurfacing job. The room comes apart, what failed behind the tile gets corrected while it is open, and the room is rebuilt. This is the sequence our contracts follow:

  1. Protection before demolition. Floor and furniture protection goes down and plastic dust tents go up, with furniture, flooring and electronics covered. Containing the dust is written into the scope, not offered as a courtesy.
  2. Strip the fixtures. Vanity, vanity top, sink faucet, mirror or medicine cabinet, light fixture, toilet and the shut-off valves behind it all come out.
  3. Strip the surfaces. Floor tile and baseboard, the shower wall tile, and the wallboard behind that tile removed all the way to the ceiling rather than stopped at the old tile line.
  4. Remove the bathing fixture. The tub or the shower pan comes out with its floor drain and drain gasket, along with the in-wall shower faucet and its piping.
  5. Inspect and report. With the room open, the subfloor, the plywood and the wall framing are inspected and you are told what is there before anything is closed up.
  6. Rebuild the wet areas. New shower valve and supply piping, cement board substrate, a new pan or tub tied to the existing plumbing, and a new floor drain.
  7. Tile, grout and seal. Wall tile carried to the ceiling, sanded grout in the field, silicone at every change of plane.
  8. Set the finishes. Vanity, vanity top, faucet, medicine cabinet, toilet and wax ring, light fixture, exhaust fan, glass shower door or curtain and rod, towel bar and toilet paper holder, baseboard and paint.

All of it is performed to the Virginia building code. Where the job relocates plumbing, adds circuits or moves a wall, that is not a finishing detail — it is the part of the remodel that has to be right before tile ever goes on.

Why bathroom subfloors and framing get inspected before rebuilding

The expensive part of a bathroom remodel is usually what nobody could see when the job was priced. Once the tile, wallboard and tub are out we inspect the plywood and the framing and report what is there. From our job files, this is what that turns up:

  • Rotted subfloor. Under tubs and failing shower pans this is routine. Where the damage is confined to the sheathing, the section is cut out and replaced before new underlayment and tile.
  • Damaged floor joists. On more than one bathroom the rot ran past the subfloor into the joists themselves, which had to be reinforced before any new floor went down.
  • Legacy floor build-ups. One bathroom floor came apart as 8x8 ceramic tile over a second layer of 1x1 ceramic, over two inches of concrete and mesh wire, all sitting on a half-inch subfloor. All of it came out and the floor was rebuilt on 3/4 inch OSB, glued and screwed.
  • Mold and staining in the cavity. Exposed framing and sheathing are treated with Concrobium Mold Control, then sealed with a stain-killer primer so wood tannins do not bleed through the new finish.
  • Missing insulation. Where a bathroom sits against an exterior wall we have found the insulation gone at the wall and around the plumbing pipes. R-15 fiberglass goes back in and the supply lines get a sleeve.
  • A subfloor that moves. Where the deck is sound but loose, it is re-screwed to the joists before cement board goes down. Tile does not forgive a floor that flexes.

None of that can be assessed from a photograph, which is why anything hidden is reported to you and agreed before it is covered up.

How a tiled shower is built in a bathroom remodel

A tiled shower fails at the substrate long before it fails at the tile. We do not tile over wallboard, and the walls are taken to framing so the build starts clean.

  • Cement board, not drywall. Shower walls and shower floors are boarded in Durock cement board. It is the most standardized material in our bathroom work.
  • A new valve, not the old one. The in-wall faucet body and piping are replaced while the wall is open, usually with a single-handle shower valve. On master showers we have specified a thermostatic mixing valve where the homeowner wanted a held, scald-protected temperature.
  • A pan tied into the existing drain. A new shower pan is set on the existing plumbing with a new floor drain. Where a mud-set floor is specified, the traditional build still applies: plastic membrane, wood blocking and a framed step, then a poured concrete slab.
  • A niche formed while the wall is open. A recessed shampoo and soap niche is built into the cement board before tiling. Adding one later means opening the wall again.
  • Tile carried to the ceiling. Wall tile runs full height instead of stopping at an arbitrary line, which means fewer edges and no painted drywall sitting directly above a shower head.
  • Sanded grout in the field, silicone at the joints. Grout across the flat runs, silicone wherever two planes meet — corners, the tub line, the pan. Grout cracks at a moving joint; silicone does not.

Where a shower has failed at the joints rather than the substrate, the fix is far smaller than a remodel: see bathroom regrouting and bathroom caulking, where the wallboard behind the tile is inspected for water damage as the old grout comes out.

Can a bathtub be converted to a walk-in shower?

Yes, and it is one of the most frequent bathroom remodels we are asked for. The tub and its drain come out, the plywood underneath is inspected and treated with mold control before anything new is set, and a new shower pan goes in on the existing plumbing with a new floor drain. The walls are stripped to framing, re-boarded in cement board with a recessed niche, and tiled to the ceiling. A glass shower door usually replaces the curtain and rod.

It runs the other way too — we have replaced failing shower pans with tubs — and accessibility changes fit the same scope. On one remodel the wall between the vanity area and the shower and toilet area came out, a comfort-height toilet went in with grab bars, and a new door was cut through to the master bedroom. Decide those things before demolition, because they change the rough-in and the shower valve position.

Can you move a shower, tub or wall to change the bathroom layout?

Layout changes are ordinary work for us, and they are usually where the value of a remodel sits. From the record: a shower wall relocated one foot; an old shower framed in as a closet while the shower moved to where the jacuzzi had been; a separate water-closet room framed inside a master bathroom; a soaking tub removed with its supply and drain piping capped in the wall; a bathroom, toilet room, closets and bedroom area reconfigured entirely.

What decides whether a wall can move is whether it carries load. Non-load-bearing partitions come out after they are confirmed as such — on one project four dining room posts were verified non-load-bearing before removal. Where a wall does carry load, temporary shoring walls go up first, the new framing follows engineering plans, and the work runs on approved drawings with permits and inspections.

Who does the plumbing, electrical and HVAC in a bathroom remodel?

We do. Sam & Sons Services is a licensed Virginia contractor — DPOR license 2705070610 — and the plumbing, the electrical and the HVAC inside a bathroom remodel are the responsibility of the same firm that signed your contract, so there is no chain of people who each answer to someone else.

In practice that means the rough-in plumbing for the shower and the vanity is ours, the shower valve and supply piping are ours, and the toilet and its shut-offs are ours. On the electrical side, the bathroom is brought up to current Virginia code as part of the remodel: circuits and devices corrected, vanity and ceiling lighting installed, and ventilation addressed — we have replaced bathroom light fixtures with proper exhaust fans in rooms that had never had one. On larger jobs the mechanical work has extended to framing ceiling bulkheads around A/C ductwork and replacing the heating equipment in the same contract.

The benefit is accountability: when the tile, the valve and the circuit are all ours, there is nobody to point at.

Do you need a permit to remodel a bathroom in Virginia?

Replacing a vanity, a toilet or a light fixture in the same location generally does not require a permit. Relocating plumbing, adding or altering circuits, moving walls or changing the layout does, and that covers most full bathroom remodels.

Where a permit is required we pull it before the job starts, in the jurisdiction the house sits in, and the work is performed on approved plans and to the Virginia building code. Permit and permit processing fees are written into the contract rather than added later. The rough-in inspection is a real milestone in our contracts — on permitted remodels, payment stages are tied to passing the rough-in inspection and to completing the drywall, which means the inspector sees the plumbing and the wiring before a sheet of cement board covers them.

That sequence protects you. Nobody should be closing a wall over a shower valve no inspector has seen.

How long does a bathroom remodel take?

The honest answer is that the schedule is set by the sequence, not by the calendar, and your contract states the milestones. A full remodel runs: protection and demolition, the subfloor and framing inspection and its written report, any structural or rot repair that report turns up, plumbing and electrical rough-in, the rough-in inspection where one is required, cement board, tile setting, grout and silicone, then vanity, toilet, glass, lighting, accessories, paint and the punch list.

Two things stretch that timeline. The first is what the inspection finds — joists needing reinforcement, or a floor built up over concrete and mesh wire, is real additional work. The second is selections: tile, vanity, fixtures and glass have to be on site when the schedule calls for them.

What does a bathroom remodel cost in Northern Virginia?

We do not quote bathroom remodeling by phone and we do not publish figures, including per-square-foot figures. A bathroom is a small room with a great deal hidden inside it, and a number given sight-unseen is either padded to cover what nobody has looked at or it is going to change once the tile comes off. Two identical-looking bathrooms can differ by a rotted subfloor, damaged joists, two inches of concrete under the old tile, a load-bearing wall, or plumbing that has to be relocated.

What we do instead is straightforward. An estimator comes to the house, looks at the room, and writes the price and the scope before anything is demolished. Where selections have not been made yet, the contract carries a stated finish allowance covering tile, plumbing and electrical fixtures, vanity, toilet, glass door and flooring, so you can choose later without renegotiating the whole job. Permit and permit processing fees are in the contract. Anything found behind the wall is reported to you and agreed in writing before it is covered up.

We have worked this way across Northern Virginia and Washington DC since 1999. If you are comparing contractors, compare what each one will put in writing before demolition — not what they will say on the phone.

Service details

Service areaNorthern Virginia
Phone(703) 256-8080
Emergency service24 hours a day, 7 days a week
Office hoursMonday–Friday 8:00am – 5:00pm
Saturday 9:00am – 12:00pm
Sunday closed
Response timeSame business day during business hours; next business day after hours
EstimatesIn person, at the property. Every job is priced only after a professional estimator has seen the work, we do not quote prices by phone or email, with some exceptions.
LicensingVirginia DPOR class A contractor license #2705070610
PermitsPulled and processed by us where the county requires them, with final inspection
Warranty1-year warranty on labor only

Frequently asked questions

How long does a bathroom remodel take from demolition to punch list?

It is driven by the sequence rather than a fixed number of days: demolition, the subfloor and framing inspection, any rot or structural repair that turns up, plumbing and electrical rough-in, the rough-in inspection, cement board, tile, grout, then finishes and paint. Your contract sets the milestones. Hidden damage and late material selections are the two things that most often extend it.

Do you tile directly over the existing drywall in a shower?

No. Shower walls and shower floors are stripped to the framing and re-boarded in Durock cement board before any tile is set. Tiling over wallboard is the reason so many of the showers we are called to rebuild have failed. Tile is then carried full height to the ceiling, with sanded grout in the field and silicone at every change of plane.

What happens if you find rot or mold under my bathroom floor?

You are told before it is covered up. Once the tub, tile and wallboard are out, the subfloor, plywood and wall framing are inspected and the findings are reported to you in writing. Damaged sheathing is cut out and replaced, damaged joists are reinforced, exposed framing is treated with Concrobium Mold Control and sealed with stain-killer primer, and the additional work is agreed before it proceeds.

Do you pull the permits for a bathroom remodel?

Yes, where the scope requires one — which most full remodels do, because they relocate plumbing, alter circuits or move walls. We pull and process the permit before the job starts, work to approved plans and to the Virginia building code, and the permit and processing fees are written into the contract. Payment milestones are tied to passing the rough-in inspection and completing the drywall.

Can you change the bathroom layout rather than replace what is there?

Yes. We have relocated shower walls, moved a shower to where a jacuzzi tub sat, framed a separate water-closet room, converted an old shower into a closet, capped the piping for a removed soaking tub and resized and relocated an entry door. Non-load-bearing walls are confirmed before removal; load-bearing walls need temporary shoring, engineering plans, a permit and inspections.

Who is responsible for the plumbing and electrical in the remodel?

Sam & Sons Services. It is a licensed Virginia contractor holding DPOR license 2705070610, and the shower valve, the rough-in plumbing, the circuits, the lighting and the exhaust ventilation inside your bathroom remodel are all on the same contract. That is the difference on accountability: one contract, one licensed firm, one inspection sequence, and nobody else to point at.

Can a bathtub be converted to a walk-in shower?

Yes, and it is one of the most common requests we take. The tub and drain come out, the plywood beneath is inspected and treated with mold control, and a new shower pan is set on the existing plumbing with a new floor drain. The walls go back in cement board with a recessed niche, tiled to the ceiling, and a glass shower door usually replaces the curtain and rod.

How much does a bathroom remodel cost?

We do not give prices by phone or publish them, and per-square-foot figures for a bathroom are meaningless before anyone has seen behind the tile. An estimator comes to the house and writes the scope and the price before demolition. Where selections are not made yet, the contract carries a stated finish allowance covering tile, fixtures, vanity, toilet, glass and flooring.

Do you remodel bathrooms in Washington DC as well as Northern Virginia?

Yes. Our remodeling work covers Northern Virginia and Washington DC, and the permit is pulled in whichever jurisdiction the house sits in. Our plumbing and heating and cooling service is Northern Virginia only, but a bathroom remodel in the District is handled by the same licensed firm, with the same inspection sequence and the same written scope before demolition.

Our own work on this

Photographs from jobs this company has carried out. No stock photography, no other contractor’s work.

BeforePowder room seen from the doorway before work, with worn dark hardwood flooring
AfterThe same powder room from the doorway after work, with black hexagon tile flooring
A powder room taken back to the subfloor and rebuilt. The worn hardwood was replaced with black hexagon mosaic tile and a new vanity and toilet were set.
Finished powder room with hexagon tile floor, dark vanity and marble countertop
The finished powder room: hexagon mosaic floor, dark shaker vanity with a marble top, and new fixtures throughout.
New dark vanity with marble countertop and framed mirror above
New vanity with a marble top, undermount basin and a framed mirror set above it.
Powder room stripped to bare plywood subfloor with the toilet removed and the flange capped
Demolition stage: old flooring lifted, the toilet pulled and capped, and the subfloor exposed so the new tile could start from a sound base.
Cement backer board fastened over the bathroom subfloor before tiling
Cement backer board screwed down over the subfloor, giving the new tile a stable, moisture-tolerant base.
Shower pan and curb coated in red waterproofing over cement board walls, square drain in the center
Bathroom remodeling in progress: the new shower pan and curb are coated with red waterproofing membrane over cement board, with the drain set, ready for tile.
Shower stall with cement board walls, red-sealed seams and a wall niche before tile, shower base on the floor
Shower walls framed out in cement board with the seams and corners sealed in red waterproofing, plus a recessed niche, during the rough-in stage of a bathroom remodel.

Licensing, insurance and guarantee

Virginia licensed contractorDPOR license #2705070610
Licensed · Bonded · InsuredFor residential and light commercial work
Serving since 199927 years in Northern Virginia

Related services

Areas we serve

Have a bathroom remodel priced in writing

Call and speak to a licensed Northern Virginia contractor. Every call is scheduled as soon as the calendar allows, and genuine emergencies are dispatched around the clock.

(703) 256-8080 Estimate